
Precio desde
$ 11.031
+ flete y aranceles — se calculan al cotizar
Tamaño
Compra protegida
Puerta a puerta
Aduana incluida
Product description Cermant Capacitor High Frequency Aluminum Electrolytic Capacitorsfor TV, LCD Monitor, Radio, Stereo, Game What is an electrolytic capacitor? Electrolytic capacitor is a kind of capacitor, the metal foil is the positive electrode (aluminum or tantalum), the oxide film (aluminum oxide or tantalum pentoxide) close to the positive electrode is the dielectric, and the cathode is made of conductive material and electrolyte (the electrolyte can be liquid or tantalum pentoxide). Solid) and other materials together, because the electrolyte is the main part of the cathode, so the electrolytic capacitor is named. Cermant High Frequency Aluminum Electrolytic Capacitors In-line electrolytic capacitors are one of the commonly used electronic components Nominal Capacitance : 100uFRated Working Voltage: 450VCapacitance Tolerance: electrolytic +/-20%Operating Temperature Range: -40deg/C ~105+deg/CSize:18X30mm(0.71x1.18in)Package included:5pcs 450V 100UF Radial Aluminum 18X30mm(0.71x1.18in) High Frequency Electrolytic Capacitor DC Blocking: Blocks the passage of current and allows AC to pass. Bypas: Provides a low-impedance path for certain parallel components in an AC circuit. Coupling: As a connection between two circuits, allowing an AC signal to pass and travel to the next stage circuit. Filtering: Turn the rectified sawtooth wave into a smooth pulsating wave, which is close to DC. Energy Storage: Stores electrical energy for release when necessary. Superior Material The capacitor's shell is made of epoxy resin.Providing insulation & flame retardancy - High security. Copper Nickel Plated Pins Strong conductivity.Smooth pins - not easy to rust.The long pin is positive and the short pin is negative. Easy to Distinguish Capacitor is neatly marked with exact uF and volt clearly.Easy to identify and improve efficiency. Stable Performance for Using High frequency but low loss.Strong overload capacity.Strong anti-pulse shock ability.High temperature resistance. 100UF Capacitor 220UF Capacitor 470UF Capacitor 1000UF Capacitor 2200UF Capacitor 4700UF Capacitor Buying Options Buying Options Buying Options Buying Options Add to Cart Buying Options Customer Reviews 4.6 out of 5 stars 3 5.0 out of 5 stars 2 4.5 out of 5 stars 6 5.0 out of 5 stars 3 4.5 out of 5 stars 22 4.7 out of 5 stars 20 Price — no data — no data — no data — no data EUR 5.19EUR5.19 — no data Capacitance(uF) 100 220 470 1000 2200 4700 Voltage(V.DC) 16/25/50 10/16/25 25/35 16/35/50 16/25 25/35/50/63 Tolerance(%) 20+- 20+- 20+- 20+- 20+- 20+- Color Green Green Black Green Green Green
Agregás al carrito
Sumás este y otros productos que querés traer.
Cotizás el envío
Calculamos flete aéreo y aranceles a Argentina.
Confirmás y pagás
Un asesor te contacta con el link de pago.
Lo recibís en casa
Tracking en tiempo real. Aduana incluida.
De la misma marca, empezando por lo más reseñado
Los mejor puntuados del mismo tipo de producto
Mismo tipo de producto y precio parecido